RTC-10 · OPERATIONS
The 50/50 Node — Partner with the System
2 hoursAdvancedEquity path
What the 50/50 Node is · who qualifies · how the split works (7% Covenant first, then 50/50) · what you need to start · scaling to a Territory Node.
For: processors · manufacturers · logistics companies
RTC-11 · OPERATIONS
The Territory Node — Own Your Area
2 hoursAdvanced80/20 split
What a Territory Node is · 80/20 split explained · claiming a territory · recruiting sub-nodes · managing collections and verification.
For: ambitious operators · entrepreneurs · existing waste companies
RTC-12 · OPERATIONS
Bin Deployment & Operation
1 hourBeginnerField-ready
Registering a new bin · location, capacity, starting beach · logging materials inside (12 polymer types) · sealing each entry · reading scan history.
For: bin operators · warehouse staff · field crews
RTC-13 · OPERATIONS
Beach Claim & Stewardship
45 minutesBeginnerOne per sov
How a beach gets claimed (one sovereign, one beach) · the duplicate-claim guard · bins that follow the claim · rolling material totals up · withdrawing a claim.
For: beach stewards · community sovereigns · cleanup leaders
RTC-14 · OPERATIONS
H.BLUE Route Optimisation (MD-462)
1 hourIntermediateDriver-grade
Why optimised routes are the floor · the three pillars (shortest/cleanest/cheapest) · the 5-step flow (trigger→cluster→solve→brief→reconcile) · driver route cards · the variance feedback loop.
For: drivers · fleet managers · operations leads