Construction sites generate 30% of UK plastic waste with no take-back loop.
Vertical Construction installs site-level take-back pods feeding the FullLoop Network.
We seek £200k to deploy 25 construction take-back pods.
Tick what's attached. The system pre-fills 40% of every application — you supply the local detail.
Current status: NOT STARTED. View full pipeline at the Grants Tracker. Win-doctrine and 40% guidance in MD-466.