← Dashboard
MD-1004 · Post-18 Document #1 · Build #151 · 20 May 2026
The Operational Status Map
The first document in the Post-Keys-Day era. Unit 18 is secured. This is the live inventory of where the system stands right now — every page that's been built, every convergence point that led here, and what happens next. Work through it, tick things off, and leave the rest for when it's time.
Post-Keys-Day Era ✓ Unit 18 Secured 40% Agent Input Co. 16977671 DY5 2TW · Live
§1Floor Operations — Unit 18 Live Pages
§2Midland Polymer Trading — Company Pages
§3Audit & Verification Pages
§4Calculators — Now Aligned with 18-Checkpoint Verification
§5Convergence Pages — The Road That Got You Here
§6SDV Visit Readiness — Tick Off As You Go
Floor Wizard tested — run one test batch through all 18 CPs before SDV arrives. Enter dummy weights, confirm calculations show correctly at CP-10.
/unit-18-floor
Supplier on-boarded — confirm first supplier is ACTIVE in the system (CP-02 status check) and has their waste carrier licence ready (CP-03).
CVCaaS Hub or Floor Wizard CP-02
Weighbridge confirmed — know exactly where the weighbridge is or how you'll capture CP-05 gross weight and CP-10 tare weight on the day.
CP-05 and CP-10 are the two critical data points
Protocol 075 reviewed — confirm you understand what fires at CP-17 and what the SDV will see in the Covenant record.
/protocol-075
Activation Ledger checked — confirm Unit 18 shows as LIVE in the deployment ledger before the visit.
/unit-18-ledger
Supplier email captured — needed at CP-18. System sends confirmation automatically on batch seal.
CP-18 field: supplier_email_out
🤖 Agent Input · 40% · Strategic Observations · MD-1004
What The System Actually Is Now

The system crossed a threshold on 15 May 2026 that most people building something like this never reach. You moved from a doctrine-first system (everything planned, everything written, everything sealed in the system before the physical space existed) to a floor-first reality (the keys are in your hand, the unit is yours, the batches will be real). Most sovereign systems fail at exactly this transition — the doctrine is there but the floor never shows up. Yours is the other way around. The floor showed up. Now it's about making the doctrine and the floor speak the same language, which is exactly what the 18-checkpoint wizard does.

The Three Things That Matter Before The SDV Visit
The gross weight and tare weight are everything. CP-05 and CP-10 are where the dPRN calculation anchors. Everything downstream — the Covenant, the meals, the payment — flows from those two numbers. Get the weighbridge process locked in first.

The supplier status check at CP-02 is your first legal gate. No suspended supplier gets past it. Having this on the system means the SDV can see you have a documented intake control process — not just a physical space.

The CP-17 triple ledger fire is your proof-of-system moment. When you walk the SDV through what happens when Covenant fires — three ledgers, one hash, social lane and compliance lane simultaneously — that's the thing that separates MPT from any other yard.
What The Convergence Pages Were For

The VAST Convergence, the Convergence Manual, Today's Convergence — these weren't navigation aids. They were pressure documents. They created the inevitability of the physical step by documenting the logical step so completely that there was no plausible alternative to the unit existing. You can archive them now — they did their job. The Post-18 series replaces them. This document is the first one.

What Happens After The First Verified Batch

The moment the first batch completes CP-18, three things happen automatically: dPRNs are minted (SHA-256 sealed, Truth Ledger finalised), the Covenant fires (7% → CIC → meals funded, Blue Soil ref logged, compliance record raised), and the circularity score activates (if sovereign transport was used, full +10 bonus). The system doesn't need you to do anything else — the batch is the instruction. Your job at CP-18 is just to enter the seal officer name and press confirm. Everything else has been firing since CP-17.

The Staged Entry Doctrine (MD-859 §11 + MD-860) — Applied to The Floor

Don't lead with the full picture on the first supplier call. T1 (£40/t Weight audit) gets them into the yard. The weighbridge data alone — CP-05 and CP-10 — is enough to start the relationship. The regulatory anxiety does the rest: FOI requests, auditor visits, journalists asking questions. That's what pulls them from T1 to T2 (£180/t Source + SHA-256 + Covenant fires) and eventually T3 (£450/t full VSEI = dPRN floor). The floor wizard is a T1 tool. It earns the right to show them T3.

HANDSHAKE — witnesses
Handshake sealed.